The Impact Nigeria NewspaperThe Impact Nigeria NewspaperThe Impact Nigeria Newspaper
Font ResizerAa
  • Home
  • News
  • Opinion
  • Metro
  • Business & Economy
  • Entertainment
  • Health
  • Politics
  • Sports
  • Video
  • World
Font ResizerAa
The Impact Nigeria NewspaperThe Impact Nigeria Newspaper
  • Home
  • News
  • Opinion
  • Metro
  • Business & Economy
  • Entertainment
  • Health
  • Politics
  • Sports
  • Video
  • World
Search
  • Home
  • News
  • Opinion
  • Metro
  • Business & Economy
  • Entertainment
  • Health
  • Politics
  • Sports
  • Video
  • World
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
HeadlinesMetro

Commuters, motorists agonise on Lagos-Ibadan Expressway over gridlock

Olatunbosun Obafemi
Last updated: June 26, 2023 9:41 am
Olatunbosun Obafemi
Share
Lagos-Ibadan Expressway.
SHARE

Over a long time now, commuters, motorists and residents living along the Lagos-Ibadan Expressway, who ply the ever-busy expressway, have been passing through hell as a result of the ongoing unending reconstruction work on the road.

The truth is that the road users have been going through pains resulting from the heavy gridlock on both sides of the dual carriageway for a long time. The untold hardship and pains have been there since the commencement of the reconstruction of the road by construction giant, Julius Berger Nigeria Plc about five years ago. But of recent, the traffic situation has worsened thereby causing untold hardship on road users.

For instance, starting from last week Friday, the whole stretch of the road was on lock down from morning to the early hours of Saturday for commuters and motorists due to the reconstruction of the expressway at Berger.

The effect of the barricade is responsible for massive traffic build-up on both sides of the road that is now causing commuters and motorists several hours to get to their destinations.

The gridlock continued Saturday and Sunday (yesterday). For Lagos-bound commuters and motorists, the gridlock was compounded by ram sellers and buyers at Kara Ram market as traffic extended from the long bridge to Berger yesterday.

Meanwhile, efforts to get the reaction of the Federal Controller of Works in Lagos State, Engr. Olukorede Keisha, were unsuccessful.

However, Lagos State Government has urged the Federal Ministry Works and Housing to suspend further work till after the Eid-el-Kabir celebration.

The Permanent Secretary, Lagos State Ministry of Transportation, Engr. Abdulhafiz Toriola, told newsmen that the Ministry of Transportation has approached the Controller of Works in Lagos of the need to suspend further work along the axis to ease off expected influx of vehicles and reduce hardship during the coming Eid-el-Kabir, Muslim celebration, scheduled to commence on Wednesday.

TAGGED:commutersexpresswaygridlockhardshiplagos-ibadanMotoristspains
Share This Article
Email Copy Link Print
ByOlatunbosun Obafemi
Follow:
Bosun Obafemi is a seasoned journalist and editor for national daily news publication outfits.
Previous Article Medical Students Accuse Marina Resort Mgt Of Negligence Over Boat Mishap
Next Article Court remands Skit Maker, Trinityguy for Sexualizing Minor in Viral Video
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

You Might Also Like

HeadlinesHealth

Case summary of COVID-19 in Nigeria on 22nd July 2020

By
Olatunbosun Obafemi
Abdul’aziz Yari
CrimeHeadlines

Court stops EFCC, ICPC, DSS from arresting Yari, ex-Zamfara governor

By
Olatunbosun Obafemi
Buhari
HeadlinesMetro

DRUGS: Buhari set up Committees on drug elimination

By
Olatunbosun Obafemi
HeadlinesPolitics

Court ruling on Ibadan PDP convention, mere academic exercise, says Wike’s faction

By
Desire Emmanuel
QUICK LINKS
About Us
Advertise with Us
Contact Us
Privacy Policy
Disclaimer
Editorial Policy
Corrections Policy
Terms & Conditions
NEWS UPDATE
Top Headlines
News
Metro News
Insurgency News
Crime News
World News
Sports
Entertainment
Human Angle Story

BUSINESS
Business & Economy
Oil & Gas
Power & Energy

EDITORIAL
Editorial
Opinion

LIFE & LIVING
Lifestyle
Single & Married
Interview

MORE
Politics
Technology
Education
Features
Health
Environment
Security
Law
Litigation
Professionals
Video
Youth
Religion

© 2026 Integrated Impact Publishers Limited. All Rights Reserved.