The Impact Nigeria NewspaperThe Impact Nigeria NewspaperThe Impact Nigeria Newspaper
Font ResizerAa
  • Home
  • News
  • Opinion
  • Metro
  • Business & Economy
  • Entertainment
  • Health
  • Politics
  • Sports
  • Video
  • World
Font ResizerAa
The Impact Nigeria NewspaperThe Impact Nigeria Newspaper
  • Home
  • News
  • Opinion
  • Metro
  • Business & Economy
  • Entertainment
  • Health
  • Politics
  • Sports
  • Video
  • World
Search
  • Home
  • News
  • Opinion
  • Metro
  • Business & Economy
  • Entertainment
  • Health
  • Politics
  • Sports
  • Video
  • World
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
EnvironmentHeadlines

FG to resume work on Lagos bridges

Olatunbosun Obafemi
Last updated: July 7, 2019 4:15 pm
Olatunbosun Obafemi
Share
Traffic on Alaka Stadium Bridge
Traffic on Alaka Stadium Bridge
SHARE

Work may soon resume on bridges in Lagos as materials imported for replacement of expansion joints on the Alaka Bridge in the state had arrived Nigeria.

The Federal Controller of Works in Lagos State, Adedamola Kuti, on Sunday said that the materials were currently being cleared at the port for the contractor to immediately mobilise to site to begin second phase replacement of damaged expansion joints.

“Important materials for the repairs of the expansion joints has arrived and we are at the point of clearing them at the Wharf.

“We would look at the very critical expansion joints and change them. The contractor has replaced two of the joints just recently,” he said.

The controller said that materials needed for replacement of expansion joints were not available locally hence the delay in fixing the bad portions and appealed for understanding by motorists.

On the damaged expansion joints causing discomfort on the popular Long Bridge on Lagos-Ibadan Expressway, he said that the joints had been repaired before.

Kuti however said that the Federal Ministry of Power, Works and Housing was carrying out a “review” of the work done on the bridge to tackle new faults.

He added that he had given a directive to Julius Berger to speed up action on reducing discomfort to motorists on the highway.

He however said that progress was being made on construction works by Julius Berger in the ongoing reconstruction/rehabilitation of the Lagos-Ibadan Expressway project.

“Rain is slowing us down but work is going on and we are making progress. As at the last report, section one which spans from Lagos to Sagamu Interchange is about 42 per cent completed,” he said.

Speaking on the trailer park in Apapa, Kuti explained that trailers were already using the park while the contractor was completing some facilities there.

“We have finished one borehole and we are doing some electrical works also,” he said.

He said that the entire trailer park project has achieved 98 per cent completion while the shoreline protection of the park was 70 per cent completed.

TAGGED:FGLagos bridgesLagos state
Share This Article
Email Copy Link Print
ByOlatunbosun Obafemi
Follow:
Bosun Obafemi is a seasoned journalist and editor for national daily news publication outfits.
Previous Article Drug addiction NGO advises motorcyclists, traders on drug abuse
Next Article Senator Elisha Abbo Women group rejects senator Abbo’s apology
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

You Might Also Like

HeadlinesNews

Drama at CCT as chairman insists that trial of Suspended CJN must continue, adjourns Feb 13

By
Olatunbosun Obafemi
EntertainmentHeadlines

Actress Toriola confirms marriage crash

By
Olatunbosun Obafemi
Jurgen Klopp
HeadlinesReligion

Jurgen Klopp defends inclusion of young players in team

By
Olatunbosun Obafemi
CrimeHeadlines

Police eliminate former Kogi PDP woman leader alleged killer

By
Olatunbosun Obafemi
QUICK LINKS
About Us
Advertise with Us
Contact Us
Privacy Policy
Disclaimer
Editorial Policy
Corrections Policy
Terms & Conditions
NEWS UPDATE
Top Headlines
News
Metro News
Insurgency News
Crime News
World News
Sports
Entertainment
Human Angle Story

BUSINESS
Business & Economy
Oil & Gas
Power & Energy

EDITORIAL
Editorial
Opinion

LIFE & LIVING
Lifestyle
Single & Married
Interview

MORE
Politics
Technology
Education
Features
Health
Environment
Security
Law
Litigation
Professionals
Video
Youth
Religion

© 2026 Integrated Impact Publishers Limited. All Rights Reserved.